How to Conduct a Feasibility Study Before You Invest
WIT Consultancy
Date Published
A feasibility study tests whether a project is viable before you commit substantial funds. It compares options, checks what supports the costs and demand, and shows what would need to change before proceeding. The result may be a pilot, a redesign or a decision to pause.
What to test before committing funds
- Define the problem and success criteria. Compare the preferred proposal with a minimum-change option and another workable alternative.
- Test demand with interviews, trial orders, observed usage or other evidence appropriate to the decision.
- Verify operational and technical needs. Check space, equipment, staffing, access, utilities and lead times with the right specialists.
- Estimate set-up costs, operating costs, benefits or revenue, cash needs and their timing. Record the assumptions behind each figure.
- Test adverse changes. Identify which assumptions can reverse the recommendation and assign owners to close major evidence gaps.
Worked example for a cold-storage project
In a hypothetical example, monthly fixed costs are 600,000 XAF and each crate contributes 1,500 XAF after variable costs. The operating break-even volume is 400 crates a month. If contribution falls to 1,200 XAF a crate, the threshold becomes 500. This comparison excludes set-up costs, taxes and financing, which the full study would assess separately.
If trial demand is 320 crates a month, the owner could compare renting capacity for a pilot with committing to a build. Verify repeat demand, power reliability and the cash needed during ramp-up before expanding.
What should the recommendation contain?
State the preferred option, why it beats the alternatives, the evidence that could change the decision and any conditions for approval. Assign a reviewer and a deadline for each unresolved issue.
Explore relevant WIT Consultancy services or discuss your project with WIT Consultancy. We work with individuals, businesses and institutions across Cameroon.
Further reading: UK Green Book international guidance.
Cover photograph: Yan Krukau on Pexels (illustrative stock photo).
Related articles

How to Prepare a Project Budget With an XAF Example
Build a project budget in XAF with a worked cost breakdown, a contingency allowance and a practical cash-flow check.

How to Choose Projects That Support Your Business Strategy
Prioritise projects by strategic fit, expected benefits, evidence and delivery capacity. Compare two proposals using a worked scoring example.